Lesson Learned





By: Drilling Engineer

Report No.

5852

Discipline/Origin

Drilling
Own Experience

Well

Norma
25/7-11 S

Date created

2023/07/30
861 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Deepsea Yantai


What happened in Top hole:
The pH meter showed indications of cement in return (pH value of 11.6-12.3). Due to poor visibility on the seabed it was not possible to look for return with the ROV camera. When checking for cement around the conductor with stinger, cement was only find on 1/4 sides of conductor 23 m below seabed.

What Was Planned

To identify cement in return with pH meter and observation of with ROV camera.

What Was Learned

That there is some uncertainty in the pH meter readings.

What Actions Are Required

If uncertainties in height on cement around conductor, use ROV stick to stick in around conductor. If no cement found with the ROV stick, use a stinger and stab in close to the conductor to find the height of cement around conductor. Use the ROV to push the stinger as close to the conductor as possible.